Chapter 4 Architecture and Structural Design

 

4.1 Architectural Design

4.1.1 Design basic information

Teh factory needs to provide local meteorological data

4.1.2 Architectural Design

In order to save land, the raw material workshop, glaze workshop, glazing workshop, firing workshop, finished product inspection, finished product warehouse, etc. in this project are placed on the first floor of the production workshop. The molding workshop, plaster mold workshop and workshop office area are placed on the second floor of the production workshop. The third floor is the casting workshop for the Phase II project (600,000 pcs). Other auxiliary workshops, substations, gas stations, offices and other buildings, if they meet different requirements, shall adopt different seismic fortification, fire prevention and other standards according to their production categories and the current relevant national design specifications. Different building structures and building levels.

4.1.3 Structural Design

Design basis: according to your site geological survey report and natural conditions.

The construction area of the project is as follows

serial number

construction project name

unit

quantity

Remark

1

Raw material and glaze workshop

m2_

3160

1.2 million pcs

2

Casting workshop

m2

37292

1.2 million pcs

3

firing workshop

m2

5000

1.2 million pcs

3

Gypsum workshop

m2

2592

1.2 million pcs

4

Finished product warehouse

m2

8000

1.2 million pcs

5

Other workshops

m2

9005

1.2 million pcs


total

m2

65049


 

 